Monday, February 16, 2026

First signs of spring 😁

Renovating the first house has been a long haul.  The guys have been so busy bagging and delivering coal and food . Between loads of coal they have been working h on the house. 




So far they have dug out , installed in floor water pipes for heating and poured new floors. And replaced the water boiler .

The interior walls have been completely stripped out and repaired . And then the old ceiling was all pulled down.  Now they are starting to bring in drywall to put up new ceilings . 




 A lot of work but the end is in sight.  We are hoping to get a bit more work done and some repairs on the truck before the next load of coal arrives. 

Fortunately we are seeing the first signs of spring in Kyrgyzstan .. a glimmer of hope. 